A 3.3-kilometre tunnel is being bored beneath Rabat to carry the TGV
3 September 2026
Under Rabat, work on the future Kénitra-Marrakech TGV has reached a new stage. A 3.3-kilometre railway tunnel is to cross part of the capital, allowing high-speed trains to (…)